Archive

Located at 25 Bunting in Winnipeg’s Inkster Industrial Park, this commercial project consisted of a complete renovation of the existing interior and exterior, as well as an addition that doubled the building’s footprint. Inside, classrooms and boardrooms feature acoustic clouds to absorb sound and improve acoustics,...

Located at the corner of Waterfront Drive and James Avenue in the heritage-protected James Avenue Pumping Station, the Pumphouse is the second of two upscale casual restaurants completed by ARCCADD in Winnipeg’s East Exchange. Throughout the re-envisioned interior space, heritage elements are integrated with modern,...

An existing fast food restaurant was completely transformed into a Qdoba, with a bright, open interior designed to optimize customer flow and an eye catching exterior façade that compliments the mall development. This is the first post-covid franchise design to incorporate a pick-up window, as...

To address the ongoing challenge of strong northerly winds chilling staff and visitors in the lobby and reception area, we developed an addition for the front façade of the building, changing the orientation of the doors. Blending seamlessly with the original construction, the addition also...

This project centred around the interior renovation of an existing office and warehouse, following a complete demolition of the existing offices. ARCCADD completed both architectural and interior design for the 7,000 sq ft open office area, boardroom and breakout rooms, executive offices, product development/lab space, staff...